Case study

IIS migration case study: coming soon

Every completed rescue gets documented in the same structured format — no vague testimonials, just the starting stack, the path chosen, and the measured result. The first write-up will appear here.

Industry

TBD

Path chosen

Rehost / Rebuild / Replace

Project length

TBD

Downtime at cutover

0 minutes

To be documented

The situation

What the business runs on the site, how old the stack is, and what prompted the call — end-of-support server, departed developer, or a hosting notice with a deadline on it.

To be documented

Before and after

The stack, side by side. Filled in with the real environment once the project ships.

Layer Before After
Server e.g. Windows Server 2012, on-premises e.g. Azure App Service
Application e.g. Classic ASP e.g. ASP.NET Core / static site
Database e.g. SQL Server Express 2014 e.g. Azure SQL Database
TLS / patching Manual, overdue Managed by platform
To be documented

The approach

Which of the three paths was chosen and why, what was preserved deliberately, and how the parallel build and staging review ran before the owner signed off.

To be documented

The result

Cutover downtime, page-speed change, hosting cost change, and what was in the documentation handover. Numbers, not adjectives.

Your site could be the first write-up.

Early projects get extra attention — the work here has to be worth documenting.

Book a free consultation